Manufacturing Plants

Engine Parts are manufactured to meet the highest standards of quality in modern, well – equipped plants at Agra. Manufacturing facilities include fully integrated non-ferrous powder plant, strip plants, press and machine shops for Engine Bearings & Bushes. A fully equipped plating plant takes care of bimetal/ overlay plating for crank shaft main & conrod bearings.

A wide range of Pistons with special asymmetric profile, groove insert, cast-in cooling coil are manufactured at our modern production facilities having access to advance technologies. CNC Machines are used for critical operations like Oval turning, Rings groove making, Cavity or Combustion Bowl machining and Pin Bore machining for achieving greater accuracies and tolerances. Piston Pins from 5mm to 55mm are produced from special graded steels on centre less grinding and superfinishing machines heat treated by fully automatic plants to ensure perfect case depth
and hardness.

The same exacting standards of tensile strength, hardness and surface finish are evident in Piston Rings available in a variety of surface coatings like chromium and molybdenum. Steel rings have been introduced in passenger car and two-wheelers segment. With technological excellence and innovative thinking we, at BENARA BEARINGS & PISTONS LIMITED, have one common objective SUPERB ENGINE PERFORMANCE with matched Cylinder Liners, Sleeves and Air Cooled Blocks.

Plant Details

PLANT – I (Agra)

  • Plant Area : 3600 Sq. Meters.
  • Power Supply : 450 KW. (Backed By Captive Self Power Generation).

PLANT – II (Agra)

  • Plant Area : 10000 Sq. Meters.
  • Power Supply : 550 KW. (Backed By Captive Self Power Generation).

MANPOWER EMPLOYED

  • SKILLED – 375
  • SEMI SKILLED – 95
  • UNSKILLED – 32
  • TOTAL MANPOWER EMPLOYED IN THE GROUP – More Than 2000 Persons

INSTALLED CAPACITY

  • PISTONS : 2 Million Pieces P.A.
  • PISTON PINS : 2 Million Pieces P.A.
  • PISTON RINGS : 3.6 Million Pieces P.A.
  • ENGINE BEARINGS : 3 Million Pieces P.A.
  • ENGINE BUSHINGS : 2 Million Pieces P.A.
  • AIR COOLED BLOCKS : 0.2 Million Pieces P.A.
  • CYLINDER LINERS & SLEEVES : 0.2 Million Pieces P.A.